| October 1997 | In the following List of References only major projects from recent years have been included. But also in the previous years works have been executed on an international basis in most European and Scandinavian countries as well as in: | |
| - Brazil, - USSR, - Australia, - New Zealand and - China. |
||
| Most brewery projects have been executed in collaboration with Alfred Jørgensen Laboratorium A/S and associated Architects and Consulting Engineers. | ||
| In a number of projects B & E Consult A/S has continued after commissioning as consultants for the brewery in order to optimize automation and process control systems and for implementing additional production equipment. | ||
| 1997 | Poland: | Further developments of the Elbrewery breweries in northern Poland. |
| Denmark: | Detailed design on new laboratory extensions for Alfred Jørgensen Laboratorium A/S, Copenhagen. | |
| Site supervision in connection with construction of new television studios for Metronome A/S, Copenhagen. | ||
| Detailed design and commissioning of three 'kindergartens' for Gentofte Kommune. | ||
| Detailed design and commissioning of a new sports-center at Virum, Copenhagen. | ||
| Detailed design and site supervision of the new SAS Cargo terminal, comprising 18,000 m2 production and 7,000 m2 administration at Copenhagen Airport. | ||
| Elaboration of renovation and maintenance schedules for more than 15 lifts in an office complex in central Copenhagen. | ||
| Registration and elaboration of documentation of main power reticulation systems for FLS Industries in Central Copenhagen. | ||
| 1996 | Poland: | Further developments of the Elbrewery breweries in northern Poland. |
| Commissioning of a fully automated fermentation control system at Warka Brewery. | ||
| Madeira: | Commissioning of fully automated fermentation and CIP control systems at Empresa de Cervejas da Madeira. | |
| Denmark: | Detailed design of a new 16,000 m2 central store for ILVA, Copenhagen. | |
| Preliminary design of a 25,000 m2 airport cargo terminal at Copenhagen Airport. | ||
| Design and support assistance in connection with the re-location of a Coca-Cola bottling line from Tuborg to Dadeko production sites. | ||
| Design and support assistance in connection with the development of a PBAS central monitoring system at Dadeco. | ||
| Software and commissioning support to DSB (Danish Rails) in connection with a main train-washing facility at Copenhagen. | ||
| Extension to and refurbishment of cargo terminal in Central Copenhagen. | ||
| Hardware and software system support and configuration to the TKL whole-sale group (OTRA-Denmark). | ||
| 1995 | Poland: | Detailed design of a new keg plant complex at Warka Brewery. |
| Continuous extensions to the breweries in Elblag, Braniewo and G'Dansk. | ||
| Russia: | Conceptual design of small shopping center, office areas and restaurants in central Moscow. | |
| Sweden: | An automatic multi-route plastic pellet transportation system in cooperation with Labotek, Denmark. | |
| Denmark: | Design supervision of new brewhouse and silo complex at Ceres Brewery, Aarhus. | |
| Detailed design of and site supervision at Maersk Air new air-craft maintenance hangars at Copenhagen Airport. | ||
| Site supervision of new City Complex at 'Midter Molen' at Copenhagen's waterfront. | ||
| A computer based vehicle control and maintenance system for the Copenhagen City Bus company. | ||
| Construction cost calculations for all electrical works required in connection with the construction of a new sub-way station at Copenhagen Airport. | ||
| 1994 | Poland: | Continuous extensions to the breweries in Elblag, Braniewo and G'Dansk. |
| Madeira: | Detailed design for a new 30,000 Hl/month beer and 20.000 Hl/month soft drink brewery in Madeira, comprising new brewhouse, cellars, bottling lines, warehouses, administration building, water treatment plants, on-site power generation, etc. | |
| Thailand: | Extension of a sugar processing plant in cooperation with Niro-DDS, Denmark. | |
| Europe: | Development of a computer based automatic fermentation system. | |
| 1993 | Thailand: | Detailed design of and purchase of components for an extension to a Niro/DDS glucose plant. |
| Poland: | Site supervision and commissioning services in connection with the Polish brewery installations. | |
| Ethiopia: | Site supervision and commissioning services in connection with starting-up of a Check Com-econ foreign aid programme. | |
| Denmark: | Budget and design supervision of new HQ for EAC in central Copenhagen. | |
| New shop and compartment complex at central Copenhagen. | ||
| 1992 | Belgium: | Preliminary Long Term Development plan for a new pre-cast building element plant. |
| Preliminary design of new townships, utilizing patented new pre-cast building elements. | ||
| England: | Preliminary design of new townships, utilizing patented new pre-cast building elements at Lady Windsor Park. | |
| Malta: | Detailed design and site supervision in connection with new beer filtration plant at SFC. | |
| Madeira: | Long Term Development plan for a new brewery at 'PIZO'. | |
| Azores: | Preliminary Long Term Development plan for a new brewery. | |
| Italy: | Long Term Development plan for a brewery extension at Birra Moretti. | |
| Poland: | Detailed design for refurbishment of a 150,000 Hl/month brewery in Braniewo, Poland, comprising new brewhouse, cellars, bottling lines, warehouses, water treatment, new keg line, new tanker station, etc. | |
| Site supervision and commissioning services in connection with the above mentioned Braniewo Brewery. | ||
| Gibraltar: | Site supervision and commissioning services in connection with the below mentioned Eurotower 1C project. | |
| Denmark: | Detailed design of municipal waste water treatment plant at Bogense, Funen. | |
| Computerized cable extrusion plant at N.K.T. (cable manufacturer) at Asnæs, Sealand. | ||
| Detailed design and site supervision of new administration building at Schulstad Brød A/S, Copenhagen. | ||
| Preliminary design of a new brewhouse and silo plant at Ceres Breweries, Aarhus. | ||
| 1991 | Gibraltar: | Detailed design of Eurotower 1C, consisting of 23,000 m2 flats, shopping areas and offices. |
| Gr.Canaria: | Elaboration of a long term development plan for the Sical Brewery. | |
| Poland: | Long term development plan for the Braniewo Brewery. | |
| Spain: | Elaboration of detailed process specification for all automated processes at the Mahou M-2 Brewery. | |
| Denmark: | Detailed design of new town center at Frederikssund. The center comprises more than 20,000 m2 shops and apartments. Elaboration of working drawings for and site supervision at the new national stadium in Copenhagen. |
|
| Elaboration of several tender projects for water purification plants all over Denmark. | ||
| 1990 | England: | Detailed design of office complex at Park Road, Crowborough. |
| Finalizing project and elaboration of working drawings for electrical installations in connection with converting a block of flats into a 'four-star' hotel in London, Hotel Port Nelson. | ||
| Spain: | Conceptual design of and pre-qualification of suppliers for a complete and fully integrated Process Control and Data Collection system at Mahou, Madrid. | |
| Denmark: | Conversion of an old brewhouse facility in central Copenhagen into a new company house for A. Jespersen & Søn A/S. | |
| Preliminary design of a new town center at Hillerød. The center comprised more than 60,000 m2 shops, offices and administration. | ||
| Detailed design of new main office, 3,000 m2, for one of the leading converting industries in Denmark. | ||
| Long term development plan for extension of production at Albani, Odense. | ||
| Programming and commissioning of several automatic silo plants for N.K.T. Industries. |